卖什么
Nuclear-inspired cooling that turns wasted power into more AI compute
商业模式拆解
买家:谁掌握预算?
未核实Data center operator infrastructure/engineering lead.
触发点:什么让他们现在购买?
Data centers power-limited: 30-40% of energy wasted on cooling, 3-7 year wait for grid power.
工作流:什么输入变成什么输出?
Rack-mounted Lambert 4U cooling unit or custom Lambert core fitting standard liquid-cooled rack sizes; adaptive phase immersion cooling with proprietary control, replacing air/direct-to-chip cooling.
经济账:省了什么,怎么收费?
Claims +55% TFLOPs/W vs air cooled, -96% cooling cost, -75% footprint, 600+ kW per rack, PUE below 1.03; hardware sale via Request Quote.
渠道:怎么接触到客户?
Request Quote / Contact us; direct sales.
融资历史与报道
| 融资日期 | 轮次 | 金额 | 投资方 | 来源 |
|---|---|---|---|---|
| — | YC 2021 夏季 | — | Y Combinator | ycombinator.com |
档案汇总自公开报道和公司官网。商业模式部分是 MaxBC 对这些材料的解读,不是已确认的事实;未知之处留空,不作猜测。 更新于 2026-10-12.