卖什么
AI-Native Engineering Firm designing Data Centers
商业模式拆解
买家:谁掌握预算?
未核实Development/engineering lead at data center developers (inferred).
触发点:什么让他们现在购买?
Pre-construction design takes 10-12 months; developers want capacity faster and want to see the site before committing capital.
工作流:什么输入变成什么输出?
Site due diligence, feasibility, concept design, then FEED/permitting design, using in-house AI tools to explore 1,000+ concepts; licensed engineers validate; client owns outputs.
经济账:省了什么,怎么收费?
Engineering services firm: claims 5-6 months vs 10-12 months and 1,000+ concepts vs 3-4; fee basis not published.
渠道:怎么接触到客户?
Inbound "Give Us a Site" request; direct sales.
融资历史与报道
| 融资日期 | 轮次 | 金额 | 投资方 | 来源 |
|---|---|---|---|---|
| — | YC 2026 夏季 | — | Y Combinator | ycombinator.com |